PSP Data installed additional CAT5e network points while the high street office was closed to enable the office manager to introduce new staff with minimum disruption.
PSP Data designed and installed a CAT6 network cabling, voice data cabling and fibre optic backbone links for the company’s new premises.
PSP have worked for Quiss on numerous projects from a cider factory in Herefordshire where hygiene and a clean working code was a big factor in the installation, to installing a new network for a disaster recovery suit at there offices in Tamworth. We have also installed fibre optic cables for one for their customers at a PVC glazing factory in Derbyshire.
PSP Data installed a cat 5e network infrastructure and fibre optic backbone within the offices and warehouse of a busy cheese factory. PSP were called in to rectify a structured cabling network that had been badly installed. The main goal here was to install a new network while keeping the existing network running until the very last minute to reduce down time.
Murphy group use PSP to install and maintain there fibre optic networks. PSP have designed and installed Singlemode fibre optic networks within Murphy groups London and Sheffield offices.
PSP designed and installed a CAT5e cabling network, fibre optic and voice cabling system to operate a wireless network for staff to use palm held scanners for stock checking.
PSP installed a CAT6 structured cabling system for the RJ Gill call centre.
PSP installed a CAT5e network for the Carphone Warehouse Call Centre in Crewe.
PSP have designed and installed a structured cabling infrastructure that will stand up to the harsh environment of an abattoir.
PSP Data have carried out CAT5e CAT6 and fibre optic installations to all of these Hammonds sites
PSP designed and installed the network cabling infrastructure within Aspire Rail's Crewe offices.
PSP were involved with the design and installation of voice and data points throughout the building
PSP Data installed additional CAT5e and CAT6 data points to DWF’s existing networks within two of their offices. Great care was needed as both offices were fully staffed and the work had to be done within office hours. The London office due proved to be a challenge due to large amounts of raised office floor that had to be lifted to prevent fall and trip hazards. The Preston office is a stunning old Victorian style town house where picture rails and ornate plaster coving needed to be considered. PSP are now the main cabling contractor for DWF sites within the UK.
PSP first worked for Maltacourt in 2008 at their office in Widnes installing a new integrated voice and data network from this work we were asked to provide them with an integrated network at there new office and warehouse premise at Feltham, Middlesex (Heathrow) in 2009. On the strength of our previous jobs PSP were then asked to supply and install there integrated network at their new office in Daresbury after out growing their premises in Widnes.
PSP have done various jobs for Fortmere within their hotel chain, from new network points for the new administration office at the Ramada Warwick, to fault finding and repairs to telephone outlets and data points across all of the Fortmere sites.
On this project PSP have under taken work on an on going bases installing data points within their yard for the wireless stock control network. To help them plan their new call centre and internet sales office.
PSP have installed new network points within their new show room at their Wigan garage and we have installed fibre optic and voice links to there Bolton garage where they have built a new workshop which needed to be linked back to there existing network.
PSP were employed by Avox to install a 10Gb fibre link and multi core voice link to connect an additional office to the main communications room. In addition to this PSP and Haylock Systems fitted out the additional office with a Brand Rex CAT5e structured cabling network and power sockets.
PSP were asked to terminate over 160 fibre optic cores and provide a detailed report using an optical time domain refractor meter (OTDR) of the fibre optic network that had been installed at the caravan park. This enables the leisure technology solutions to install a WiFi network that covered all the parks caravan sites.
PSP Data installed and maintain the structured cabling network within the main site and also install data cabling networks within KMI’s temporary site accommodation all over the Northwest and Cumbria. Working alongside KMI’s project managers to ensure a seamless migration of staff.
PSP were called out to repairs fibre circuits controlling the CCTV at the V festival and the Leeds festival.
We have installed a Brand Rex CAT6 system for Meyertech within their new offices. PSP won the business due to its presentation and attention to detail.
PSP have designed and installed a Fibre and copper network within Myprotein’s new offices and warehouse in Wythenshawe.
PSP have installed CAT5E network points for this age old business to ensure that they stay up to date with technology.
PSP were asked to add new points to their existing network. We have been asked back several times to add more additions to the network and to fault find after building work was carried out in the past.
PSP have assisted the company with their expansion into additional office space by installing 10Gb optical fibres and a Brand Rex network cabling system to ensure Gigabit Ethernet without compromise.
PSP carried out an emergency fibre repair for Foxwire.
Add new network points to their existing office network in Oldham.
Our engineers relocated the structured cabling for the internet betting company. Work had to be carried out overnight during a strict amount of downtime.
PSP carried out a full audit and cabinet upgrade for Nederman. All work was carried out during a weekend to ensure no downtime for office staff.
We installed an armoured 10Gb fibre link between sites and a CAT6 network
PSP installed additional CAT5e network cabling under the instruction of WWF systems
PSP installed CAT5e cabling to network the tills in this busy city centre karaoke bar.
PSP installed additional network cabling for Highfields Primary School in Nantwich.
When a fibre optic cable that controls the BMS within the store was cut by a contractor, PSP were called out and had the link repaired within four hours.
PSP installed high level wireless access points on behalf of React within a very busy distribution warehouse in Oldham. This involved working at height with special access equipment and following a strict method statement to ensure safe working practice.